In order to discharge these conditions, please submit the following:
- scaled plans showing the location of a proposed installation, including any drainage field or outfall
- details of any proposed soak away, including sections and volume capacity
- percolation test results where outfall is to ground – the test works out the absorption rate of soil for a septic drain field
- confirmation that an Environment Agency discharge permit is required or that the installation meets the exemption
- supporting statements detailing if the non-mains drainage system will have adverse effects
- a copy of advice received from Wessex Water (only needed if you are connecting to a main sewer)